BinAC2: Difference between revisions

From bwHPC Wiki
Jump to navigation Jump to search
(Created page with "{| style="width: 100%; border-spacing: 5px;" | style="text-align:center; color:#000;vertical-align:middle;font-size:75%;" | center|border|250px||...")
 
No edit summary
 
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{| style="width: 100%; border-spacing: 5px;"
{| style="width: 100%; border-spacing: 5px;"
| style="text-align:center; color:#000;vertical-align:middle;font-size:75%;" |
| style="text-align:center; color:#000;vertical-align:middle;font-size:75%;" |
[[File:BinAC Logo RGB.jpg|center|border|250px||]]
[[File:BinAC2_Logo_RGB_subtitel.svg|center|500px||]]
|-
|-
|
|
|}
|}


The bwForCluster BinAC 2 supports researchers from the broader fields of Bioinformatics, Astrophysics, and Geosciences.
The '''bwForCluster BinAC 2''' supports researchers from the broader fields of Bioinformatics, Astrophysics, Geosciences, Pharmacy, and Medical Informatics.

{{Template:Status|warn|Status: Upcoming maintenance: 10 September 2026, 10:00-18:00}}
The mainboard of the Lustre server that caused the latest outage will be replaced.

'''During this period:'''
* Already running jobs will continue, but file system access will be blocked as long as the server is down.
* No new jobs will start during the maintenance period.
* Jobs running when maintenance begins will get a wall time bonus to prevent data loss due to premature termination of job scripts.
* Access to <code>WORK</code> and <code>PROJECT</code> from the login nodes will also hang.
* We hope that all clients reconnect as soon as the server is brought back so that I/O will continue smoothly.
* You might suffer data loss if your job uses timeouts for I/O operations and does not wait until the file system comes back.

{{Template:Status|warn|Status: Upcoming maintenance: 17 September 2026, 08:00 - 18 September 2026, 17:00}}
The University of Tübingen will conduct a campus-wide emergency power test. To prevent any risk of damage, the entire BinAC 2 cluster will be shut down during this test.

'''During this period:'''
* We will use this downtime to update BinAC 2 nodes.
* No jobs that would run into the maintenance window will be started.
* Jobs finishing before the downtime begins can still be executed.


{| style=" background:#FEF4AB; width:100%;"
| style="padding:8px; background:#FFE856; font-size:120%; font-weight:bold; text-align:left" | News and Events
|-
|
<!--* [https://uni-tuebingen.de/de/274923 11th bwHPC Symposium - September 23rd, Tübingen]-->
<!--TODO* [http://vis01.binac.uni-tuebingen.de/ Cluster Status and Usage]-->
|}


{| style=" background:#eeeefe; width:100%;"
{| style=" background:#eeeefe; width:100%;"
Line 12: Line 40:
|-
|-
|
|
* [[BinAC2/Quickstart_Guide|Quickstart Guide]]
* [[BinAC2/Getting_Started|Getting Started]]
<!--TODO* [http://vis01.binac.uni-tuebingen.de/ Cluster Status and Usage]-->
* [https://training.bwhpc.de E-Learning Courses]
* [https://training.bwhpc.de E-Learning Courses]
* [[BinAC2/Support|Contact and Support]]
* [[BinAC2/Support|Contact and Support]]
* Send [[:Category:Feedback|Feedback]] about Wiki pages
* Send [[Feedback|Feedback]] about Wiki pages
|}
|}


Line 23: Line 50:
|-
|-
|
|
* [[Registration]] for one of the bwHPC clusters
* [[Registration/bwForCluster|Registration]]

* [[BinAC2/Login|Login]]
* [[BinAC2/Login|Login]]

* [[BinAC2/Hardware_and_Architecture|Hardware and Architecture]]
* [[BinAC2/Hardware_and_Architecture|Hardware and Architecture]]
** [[BinAC2/Hardware_and_Architecture#Storage_Architecture|File Systems]]
** [[BinAC2/Hardware_and_Architecture#Compute_Nodes|Node Specifications]]
** [[BinAC2/Hardware_and_Architecture#File_Systems|File Systems and Workspaces]]
* Usage of [[BinAC2/Software|Software]] on BinAC
* Usage of [[BinAC2/Software|Software]] on BinAC 2
** For available Software Modules see [https://www.bwhpc.de/software.php bwhpc.de Software Search] (select bwForCluster BinAC)
** For available Software Modules see [https://www.bwhpc.de/software.php bwhpc.de Software Search] (select bwForCluster BinAC 2)
** Create Software Environments with [[Development/Conda|Conda]]
** Use [[BinAC2/Software/Nextflow|nf-core Nextflow pipelines]]
** See [[Development]] for info about compiler and parallelization


* [[BinAC2/Slurm|Batch System]]
* [[BinAC2/Slurm|Batch System (SLURM)]]
** [[BinAC2/Queues|Queues]]
** [[BinAC2/SLURM_Partitions|SLURM Partitions]]
** [[BinAC2/Memory_Usage|Memory Usage]] tips


|}
|}

Latest revision as of 12:19, 8 September 2026

BinAC2 Logo RGB subtitel.svg

The bwForCluster BinAC 2 supports researchers from the broader fields of Bioinformatics, Astrophysics, Geosciences, Pharmacy, and Medical Informatics.


Status: Upcoming maintenance: 10 September 2026, 10:00-18:00

The mainboard of the Lustre server that caused the latest outage will be replaced.

During this period:

  • Already running jobs will continue, but file system access will be blocked as long as the server is down.
  • No new jobs will start during the maintenance period.
  • Jobs running when maintenance begins will get a wall time bonus to prevent data loss due to premature termination of job scripts.
  • Access to WORK and PROJECT from the login nodes will also hang.
  • We hope that all clients reconnect as soon as the server is brought back so that I/O will continue smoothly.
  • You might suffer data loss if your job uses timeouts for I/O operations and does not wait until the file system comes back.


Status: Upcoming maintenance: 17 September 2026, 08:00 - 18 September 2026, 17:00

The University of Tübingen will conduct a campus-wide emergency power test. To prevent any risk of damage, the entire BinAC 2 cluster will be shut down during this test.

During this period:

  • We will use this downtime to update BinAC 2 nodes.
  • No jobs that would run into the maintenance window will be started.
  • Jobs finishing before the downtime begins can still be executed.


News and Events
Training & Support
User Documentation
Cluster Funding